Serving Bryan, College Station & the Brazos Valley (979) 401-0330

How we build a custom pool in Bryan–College Station: our 9-step construction process

By Chris Gray, owner of AquaTex Custom PoolsPublished Updated 7 min read
Steel rebar and plumbing set in a pool excavation

Thinking about a custom pool for your home in Bryan or College Station? Knowing how the build works makes every decision easier. Building a concrete (gunite) swimming pool takes careful planning, proper construction techniques and close attention to local building codes.

At AquaTex Custom Pools, we're a family-owned, Aggie-owned pool builder based in Bryan, Texas. We're a Certified Building Professional, and we keep educating ourselves on the best practices for pool construction. Below is exactly how we build custom pools and spas for homeowners across Bryan, College Station and the Brazos Valley, from the first design to the first swim, with photos from our own job sites.

01

Step 1: Pool design & permits

Every pool starts on paper. We work with you to choose the size, shape and depth based on how you want to use the pool and the space your backyard has to offer. Once the design is set, we handle the permits so construction can follow local building codes from day one.

Pool design plans with tile and finish samples
02

Step 2: Excavation & form work

Machinery excavates the area where the pool will sit, removing the topsoil and digging to the dimensions of the pool structure. Wooden forms are then set to outline the exact shape of your pool.

Skid steer excavating a backyard pool site
03

Step 3: Steel reinforcing & plumbing

Steel rebar is tied throughout the excavation to give the shell its strength. Before any concrete goes in, the plumbing for water circulation, filtration and drainage is installed.

Steel rebar and plumbing set in a pool excavation
04

Step 4: Gunite application

A mixture of cement, sand and water is sprayed onto the forms and steel reinforcement. It builds up into a solid, durable concrete shell, the structure your whole pool depends on.

Crew shaping freshly sprayed gunite
05

Step 5: Pump & filter installation

The filtration system is installed and connected to the plumbing, along with any extras in your design, such as heaters or waterfalls.

Pool pump, filter and plumbing on the equipment pad
06

Step 6: Tile work

Once the concrete has cured, tile finishes the top of the shell at the waterline. Coping goes on next, along with features like steps or a diving board.

Blue glass tile at the waterline and coping
07

Step 7: Decking & landscaping

The area around the pool gets its decking material. This is also when optional extras like plants, lighting and seating come together to finish the space.

Crew forming and pouring concrete decking
08

Step 8: PebbleTec plaster

The interior is coated with a PebbleTec finish, giving the pool a smooth, waterproof and durable surface that holds up for years.

Crew applying PebbleTec plaster to the pool interior
09

Step 9: Water filling & testing

Finally, we fill the pool, balance the water chemistry, and test and adjust every system so everything runs the way it should before you take the first swim.

Freshly filled pool and spa

Custom pools we've built in the Brazos Valley

Every one of these backyards went through the same nine steps. See more in our project gallery.

Sport-profile pool with rain curtain waterfall in College Station, TXRain Curtain Sport Pool, College Station18×38 ft sport pool, 18-ft rain curtain, fire pit Custom pool with sunken fire-pit lounge by AquaTex Custom PoolsFireside SanctuarySunken seating, fire pit, perimeter overflow spa Custom pool with blue glass tile, fire and water bowls and sheer descent waterfalls by AquaTex Custom PoolsSapphire EmberPebble Brilliance plaster, fire bowls, sheer descents

Ready to build your pool in Bryan or College Station?

Schedule a design consult, or call us at (979) 401-0330.

Schedule a design consult

← Back to the blog